Acclaro
Corporation

Acclaro Corporation Acclaro Corporation Acclaro Corporation Acclaro Corporation
  • Home
  • Introduction To Acclaro
  • Acclaro Vision
  • Corporate History
  • Engineering Services
  • Oil & Gas
  • Energy Infrastructure
  • Mining
  • Electric Vehicle Charging
  • Project Management
  • Heritage Projects
  • Landmark Projects
  • Contacts

Acclaro
Corporation

Acclaro Corporation Acclaro Corporation Acclaro Corporation
  • Home
  • Introduction To Acclaro
  • Acclaro Vision
  • Corporate History
  • Engineering Services
  • Oil & Gas
  • Energy Infrastructure
  • Mining
  • Electric Vehicle Charging
  • Project Management
  • Heritage Projects
  • Landmark Projects
  • Contacts

Decades of Delivering Excellence

Penstock Installation & Replacement

Gas Well and Heavy Oil Pipeline Tie In

Gas Well and Heavy Oil Pipeline Tie In

EPC contractor for the installation of 8-foot and 11-foot penstock pipelines, including both new construction and pipeline replacements, in the mountainous regions of Western Canada.This complex project involved drill-and-blast operations to establish new right-of-way routes through some of the most environmentally sensitive areas of the Canadian Rockies. The work was carried out with precision and care to support the upgrade of existing hydro power infrastructure while upholding strict environmental stewardship.

Gas Well and Heavy Oil Pipeline Tie In

Gas Well and Heavy Oil Pipeline Tie In

Gas Well and Heavy Oil Pipeline Tie In

EPC manager on multiple projects ranging from small-bore pipe gathering systems and gas well tie-ins across Alberta and British Columbia to pipeline support services in the Heavy Oil Division at the Horizon Heavy Oil Sands Project in Fort McMurray, Alberta.

Versatility and capability to deliver high-quality pipeline solutions across diverse environments and operational scales—from remote well sites to major oil sands facilities.


Hydro Electric

Gas Well and Heavy Oil Pipeline Tie In

Hydro Electric

EPC contractor of a 20MW hydro electric project in Western Canada featuring the installation of 48-inch and 72-inch penstock. 

This comprehensive scope included in-river works, concrete infrastructure, and power station construction and utility interconnection, all executed with a focus on environmental sensitivity, safety, and operational excellence in a remote and challenging setting.